Water board inspection result
Hi
Any help appreciated on this one. We recently bought a ground floor apartment.
We have received an email from the solicitor (post-purchase) forwarded from the water board about an inspection they carried out 16.03.2022.
It's in Spanish, so we've done our best. There are a lot of diagrams.
It would appear that we have 60 days to 'put right' the following:-
Discover pipe, install 3/4 bypass valve and anti-fraud valve
Install manhole cover on facade (40x30)
Replacement of asphalt/steel
PVDF pipe diam 25mm
Delivery of forms with construction details.
1. Is this common, has anyone experience of this?
2. Can you point us in the right direction of a plumber/engineer that can carry out such works?
3. We are not visiting until the 28th
Thank you so much in advance x